Documents

Documents

Access prior studies and reports related to the Brent Spence Bridge Corridor Project.

Ohio and Kentucky are in the process of reviewing the design and engineering study that was completed several years ago. Document appendices are available upon request by submitting a comment.

Click on the state name to access PDFs of the recommended alternative plan views for Kentucky (3.7mb) and Ohio (5.8mb).

PROJECT FACT SHEET AND FREQUENTLY ASKED QUESTIONS (FAQ)

The Bipartisan Infrastructure Law (BIL) has created a once-in-a-generation opportunity to improve the Brent Spence Bridge Corridor for millions of Americans who travel between Ohio and Kentucky. Learn more here. View the project FAQ here.

ADVISORY COMMITTEE INFORMATION

The Brent Spence Bridge Corridor project is led by ODOT and KYTC with input from a group of stakeholders through a project advisory committee. Learn more here.

MEMORANDUM OF UNDERSTANDING (MOU) arrow-location-down

A Memorandum of Understanding (MOU) was entered into between Ohio and Kentucky on October 4, 2004 to study the Brent Spence Bridge Corridor. There have been six supplements. Below is a link to a file containing the original MOU and all supplements.

MOU Agreements8.8MB

2024 arrow-location-down

2023 arrow-location-down

2022 arrow-location-down

2021 arrow-location-down

2020 arrow-location-down

2019 arrow-location-down

2018 arrow-location-down

2017 arrow-location-down

2015 arrow-location-down

2014 arrow-location-down

2013 arrow-location-down

2012 arrow-location-down

2011 arrow-location-down

2005 arrow-location-down

Environmental Assessment and FONSI arrow-location-down

Appendix A - Previous Studies and Reports arrow-location-down

Appendix B - Traffic Data arrow-location-down

Appendix C - Engineering Files arrow-location-down

Appendix D - Cost Estimates and Property Maps arrow-location-down

Appendix E - Public Involvement and Coordination arrow-location-down

Appendix F - Technical Reports arrow-location-down